P5.1 work platform installation – JLG TF6-42 Service Manual Manuale d'uso
Pagina 76

Always be certain that work
platform is properly positioned on
boom head and is secured by lock
pin and retainer pin. Failure to
ensure proper installation could
permit attachment to disengage
and cause serious injury or death.
WARNING
!
This installation procedure is
designed for one-man operation. If
a helper is involved, shut off the
engine before proceeding to steps
4, 5, and 6.
1. Retract Quick Switch™ (attachment
tilt lever forward) to provide clear-
ance. Check to be sure lock pin is
secured in out position with retainer
pin.
2. Align boom head pivot with recess in
attachment. Raise boom slightly to
engage boom head pivot in recess.
4. Remove retainer pin and slide lock
pin in fully.
5. Secure lock pin in locked position using
retainer pin.
3. Engage Quick Switch™ (attachment
tilt lever backward).
6. Swing saddles down and pin in
place.
WARNING
!
P5.1
WORK PLATFORM INSTALLATION