Commercial peripherals installation – Fast & Fluid LEOLUX NV Manuale d'uso
Pagina 18

FAST & FLUID MANAGEMENT srl
A Unit of Idex Corporation
1155495A-it,en - 24/05/07
18
COMMERCIAL PERIPHERALS INSTALLATION
(Fig.7)
1
Æ LCD Power Supply
2
Æ Printer USB cable
3
Æ Printer Power Supply 12V
4
Æ Keyboard PS/2 cable
5
Æ Mouse PS/2 cable
(Fig.10)
To install the LCD, make the VGA
cable (6) pass through the bracket
(Fig.11)
Connect the LCD power supply
cable (1)
(Fig.12)
Fix the LCD by the 4 Allen screws or
button-head screws (depending on
the right threaded length) by means
of an Allen wrench dim. 3 or 2.5
(Fig.13)
To install the keyboard, make the
PS/2 cable pass through the
bracket rectangular pocket
(Fig.14)
Connect the printer to the power
supply and the USB cable
(Fig.15)
Place the Mouse and make the VGA
cable (6), the keyboard (7) and
Mouse cable (8) pass through the
diaphragm hole behind the keyboard
6
1
7
2
3
8
6
7
1
2
3
4
5